ANY SIZE RESIDENTIAL & COMMERCIAL INTERIOR OR EXTERIOR PROJECTS WELCOME 

Bathroom Remodeling

Important Facts To Consider In Bathrooms

Removal of the original fiberglass two piece tub at 2nd floor, leaking water from the drain to 1st floor ceiling from improper bracing and missing reinforcements.

 Removal of water damaged drywall. 

After replacing the insulation and the Backer board, then a thin set mortar with a fiber mesh is applied to all the joining seams. We then apply one of of many water proofing systems called Red Guard. Backer board is a substrate material for tile with many benefits such as its high mildew resistance and helps create a consistent level surface.

 

12" x 24"porcelain tiles with small epoxy grout lines was chosen to minimize maintenance and water seepage.

Porcelain Tile is used as a better finish choice creating a less porous surface in high moisture areas.

         New Appliance Installation        & Haul Away The Old

        Hardwood Floor Installation                               & Refinishing

                   Installing Lighting                     & Flat Screen TV'S 



Hardwood Floor Installation,

Refinishing, & Repairs

Refinishing hardwood floors increase home value significantly. Average return on refinishing your hardwood floors is better than 300%. 

When you are not satisfied with the condition of any room in your home, and would like to change that??? Give RDF Contractors & Property Maintenance llc a call to let us help.

 

 

Roofing & Vinyl Siding Gallery

FLASHING & SEAMLESS GUTTERS 

© Copyright. All rights reserved.

We need your consent to load the translations

We use a third-party service to translate the website content that may collect data about your activity. Please review the details in the privacy policy and accept the service to view the translations.